Group Admins:
Location: Lochgilphead, Argyll
About this group
The new village hall in Criagnish was opened in 2005. From the outset the community wanted a building that was as environmentally friendly as possible. Underfloor heating is powered by a ground source heat pump, the hall includes masses of insulation, an innovative waste water system, low energy fittings, and recycling facilities.